KIRAZLI 1 BAŞAK KONUTLARI AND OLIMPIYAT KÖY CONNECTION MASS TRANSPORT PROJECT

Starting Date 2006
Completion Date 2013
Line Length 15809 Metres
Number of Station 5
Scope Design and Construction of the Electromechanical Systems

EXPLANATION
Kirazlı 1 Başak Konutları and Connection are of Olimpiyat Köy Mass transport Project is designed as double track and the length of the lines is 11704+4105=15809 meters. Along the line there are 12 stations. The Kirazlı 1 – Başak Konutları line starts from Kirazlı 1 station through Kirazlı, Mahmutbey, İstoç, İkitelli Sanayi, Başak Konutları 1 and reaches to Başak Konutları 4.
Olimpiyat köy connection has got 3 station. Line starts from İkitelli G Sanayi and after Halkalı reaches Olimpiyat Park station.