ÇUKURHISAR SOUTH ROAD CATENARY SYSTEMS DISPLACEMENT PROJECT

Starting Date 2016
Completion Date 2016
Line Length 1,5 Km.
Scope Catenary Systems

EXPLANATION
The dismantling of the catenary systems in the 12 pylons on the existing road in Çukurhisar was done and 12 of the half-portal assemblies on the south road were displaced.